The objective is to design the modification of the existing district cooling system and the subsequent connection to
all individual buildings in the science park such that the cooling system operates as an interconnected system. The
extension works involves the DCS extension from the existing phase 2 service tunnel to phase 1 service tunnel area.
@ Shatin
MEP Designer + Project Manager
Completed in 2020